---
title: "NASA Selects Lunar Communications Deployment and Power Components"
id: 219598
type: "post"
slug: "nasa-selects-lunar-communications-deployment-and-power-components"
author: "NSE"
published: "2026-11-09T05:00:00+00:00"
modified: "2026-11-09T00:56:16+00:00"
canonical: "https://newspaceeconomy.ca/2026/11/09/nasa-selects-lunar-communications-deployment-and-power-components/"
markdown_url: "https://newspaceeconomy.ca/2026/11/09/nasa-selects-lunar-communications-deployment-and-power-components.md"
description: "NASA selected SpaceX to deploy communications satellites into cislunar space aboard Starship in 2028. The November 7 announcement also assigned lunar…"
language: "en-US"
category:
  - "Communications Market"
  - "Moon"
  - "Space Economy"
post_tag:
  - "Cislunar"
  - "Lunar"
  - "Lunar Infrastructure"
  - "NASA"
  - "SpaceX Starship"
---

# NASA Selects Lunar Communications Deployment and Power Components

![](https://i0.wp.com/newspaceeconomy.ca/wp-content/uploads/2026/11/e45f69b2-9766-49c1-9187-4966074ad8f1.png?resize=696%2C464&ssl=1)

[NASA](https://www.nasa.gov/) selected [SpaceX](https://www.spacex.com/) to deploy communications satellites into cislunar space aboard Starship in 2028. The [November 7 announcement](https://www.nasa.gov/news-release/nasa-awards-moon-base-transportation-technology-science-projects/) also assigned lunar power-component work to Honeybee Robotics, Redwire, and Yank Technologies.

The Starship assignment is a communications deployment demonstration. It will support development of networks connecting lunar operations with mission controllers.

The surface project, miniCAST, combines communications and power functions. Honeybee Robotics will supply energy-storage capability, Redwire provides power generation, and Yank Technologies will contribute wireless power-transfer hardware.

These components address separate functions: producing electricity, retaining energy for later use, and transferring power to equipment. [NASA](https://www.nasa.gov/)’s Marshall Space Flight Center will assemble and test the systems.

[NASA](https://www.nasa.gov/) also plans a separate solicitation for integrated power systems in early 2027.
