| DoD | TACTICAL CASE, 400-WATT MINI ADAPTER, DUAL POWER SUPPLY. | 2026-04-24 | 145,461.56 | obligated | Link |
| NASA | HABITABLE WORLDS OBSERVATORY SYSTEM TECHNOLOGY DEMONSTRATIONS AND MISSION ARCHITECTURE STUDIES | 2026-04-20 | 19,216,706 | obligated | Link |
| DoD | THE OPERATIONAL SUPPORT AIRLIFT/EXECUTIVE AIRLIFT (OSA/EA) COMBINED COMMERCIAL SATELLITE COMMUNICATIONS (COMSATCOM) SERVICES REQUIREMENT IS FOR GLOBAL COMMUNICATIONS CONNECTIVITY FOR UNITED STATES (U… | 2026-03-31 | 57,140,654.72 | obligated | Link |
| NASA | L3Harris Technologies: DESIGN, DEVELOPMENT, FABRICATION, ALIGNMENT, TESTING, VERIFICATION, DELIVERY, AND ASSOCIATED POST-DELIVERY SUPPORT SERVICES FOR THE LASER INTERFEROMETER SPACE ANTENNA (LISA) EN… | 2026-02-13 | 16,900,000 | — | — |
| DHS | SATCOM OPERATION MAINTENANCE | 2025-09-27 | 150,000 | obligated | Link |
| DHS | CID PORTABLE RADIO COMMUNICATIONS (PRC) | 2025-09-19 | 181,132 | obligated | Link |
| DoD | THE UNITED STATES (U.S.) AIR FORCE (USAF) SLC3S-A BROADBAND AMSS-HCX SERVICES REQUIREMENT IS FOR COMMUNICATIONS CONNECTIVITY FOR U.S. SENIOR LEADERS ON THE OPERATIONAL SUPPORT AIRLIFT (OSA) / EXECUTI… | 2025-03-27 | 41,676,966 | obligated | Link |
| DoD | THE CONTRACTOR SHALL COMPLETE A SOFTWARE PORTING ASSESSMENT STUDY FOR THE RAMS MISSION APPLICATION SOFTWARE FROM COUNTER COMMUNICATIONS SYSTEM (CCS) 10.2 INTO MEADOWLANDS, IN ACCORDANCE WITH ATTACHME… | 2024-09-30 | 49,979 | obligated | Link |
| DoD | AIS DATA SUBSCRIPTION | 2024-09-25 | 68,180 | obligated | Link |
| DoD | DELIVERY ORDER FOR 1 TERMINAL | 2024-09-20 | 57,233,326 | obligated | Link |
| DoD | LWST | 2024-07-02 | 40,470 | obligated | Link |
| DHS | VERT AND DIPOLE ANTENNAS FOR MSRTE COMUNICATIONS DIVISION | 2023-04-14 | — | obligated | Link |
| NASA | GEOXO IMAGER (GXI) INSTRUMENT IMPLEMENTATION | 2023-03-23 | 343,955,638 | obligated | Link |
| DoD | AIS DATA LICENSES (THAILAND) | 2022-12-28 | 995,520 | obligated | Link |
| DoD | GLOBAL SATELLITE COMMUNICATIONS TURNKEY SYSTEM | 2022-08-18 | 35,228,082.42 | obligated | Link |
| Department of Justice | SATELLITE COMMUNICATION SERVICES FOR FCI TERMINAL ISLAND FY 21. | 2021-12-20 | 60.05 | obligated | Link |
| Department of Justice | SATELLITE COMMUNICATION SERVICES FOR FCI TERMINAL ISLAND FY 21. | 2021-12-20 | 60.05 | obligated | Link |
| DoD | ADVANCED TRACKING AND LAUNCH ANALYSIS SYSTEM | 2021-11-29 | 90,941,709.82 | obligated | Link |
| NASA | L3Harris Technologies: GEOSTATIONARY AND EXTENDED ORBITS (GEO-XO) SOUNDER (GXS) PHASE A STUDY | 2021-10-13 | 8,992,945.60 | — | — |
| DoD | TWO (2) VSAT TERMINALS-PANTHER II SYSTEMS | 2021-06-24 | 243,440 | obligated | Link |
| NASA | L3HARRIS WILL PROVIDE TRAINING ON THE SOFTWARE DEVELOPMENT PROCESS FOR THE APPSTAR MICRO SDR PLATFORM INCLUDING THE ZYNQ FPGA EMBEDDED ARM PROCESSOR AND LEON PROCESSOR. NECESSARY DOCUMENTS AND/OR EX… | 2021-04-30 | 151,326.73 | obligated | Link |
| NASA | GEO-XO IMAGER PHASE A FORMULATION | 2021-04-12 | 7,384,461 | obligated | Link |
| Space Force | L3Harris Technologies: SDA TRACKING LAYER TRANCHE 0, WIDE FIELD OF VIEW (WFOV) PROGRAM | 2020-10-02 | 221,056,349 | — | — |
| Space Force | L3Harris Technologies: AWARD OF MAINTENANCE OF SPACE SURVEILLENCE AND INTEGRATED CAPABILITIES CONTRACT | 2020-02-25 | 1,332,092,234.74 | — | — |
| Space Force | L3Harris Technologies: THIS PERFORMANCE WORK STATEMENT (PWS) FOR WIDEBAND SATELLITE COMMUNICATIONS (SATCOM) OPERATIONS AND TECHNICAL SUPPORT II (WSOTS II) DEFINES THE REQUIREMENTS TO PROVIDE U.S. ARM… | 2018-12-01 | 184,775,229.85 | — | — |
| NASA | L3Harris Technologies: ADVANCED, LARGE APERTURE MIRROR TECHNOLOGY DEVELOPMENT PROGRAM PHASE II IN SUPPORT OF ULTRAVIOLET, OPTICAL, AND INFRARED (UVOIR)-CLASS SPACE TELESCOPES | 2014-12-15 | 2,444,315.23 | — | — |
| NASA | L3Harris Technologies: THE CONTRACTOR SHALL PROVIDE THE PERSONNEL. MATERIALS, AND FACILITIES NECESSARY TO DESIGN. DEVELOP, INTEGRATE, TEST AND SUPPORT GOES IMAGER AND SOUNDER INSTRUMENTS; SUPPORT INS… | 1996-09-15 | 240,731,492.57 | — | — |