| NASA | PISCES III - FS | 2026-08-20 | 424,164 | obligated | Link |
| NASA | DAMASCUS - CD | 2026-08-07 | 999,926 | obligated | Link |
| NASA | Lockheed Martin: SPACE WEATHER GEOSTATIONARY (SW GEO) PHOTOSPHERIC MAGNETOGRAPH IMAGER (PHOMI) PHASE A STUDY | 2026-06-01 | 1,498,691 | — | — |
| DoD | CONCEPT DEVELOPMENT MINIMUM GUARANTEE | 2026-04-29 | 100,000 | obligated | Link |
| NASA | THE COMMERCIALIZATION, INNOVATION, AND SYNERGIES (CIS) OFFICE'S FOURTH CAPABILITY STUDIES BAA IS SEEKING INDUSTRY INSIGHTS IN THE FOLLOWING AREA: MARS END-TO-END SERVICE ARCHITECTURES. | 2026-02-27 | 253,723 | obligated | Link |
| NASA | Lockheed Martin: JOINT POLAR SATELLITE SYSTEM-4 (JPSS-4) PAYLOAD PROCESSING SERVICES | 2026-01-30 | 4,847,818 | — | — |
| NASA | THE CONTRACTOR SHALL PROVIDE THE ITEM OR SERVICES SPECIFIED IN SECTION B IN ACCORDANCE WITH THE FOLLOWING: SOW ENTITLED "SAFER III" WHICH WILL BE PROVIDED UNDER SEPARATE COVER. (END OF CLAUSE) | 2026-01-20 | 3,356,537.19 | obligated | Link |
| NASA | CX-1 CLPS TRADE STUDY MID-SIZED LANDER CAPABILITY ASSESSMENT LOCKHEED MARTIN BASE AWARD | 2025-07-16 | 599,962 | obligated | Link |
| DoD | RELAY CONTROL ELEMENT (RCE) SUPPORT AND SUSTAINMENT. THE SERVICES INCLUDE DESIGN, MODERNIZATION, AND INSTALLATION ACTIVITIES FOR OPERATIONS AND MAINTENANCE SUPPORT AND NETWORKING SUPPORT IN ACCORDANC… | 2025-07-14 | 10,950,009.08 | obligated | Link |
| NASA | THIS IS A FFP CONTRACT FOR NEXTSTEP2 APPENDIX R: LUNAR LOGISTICS AND MOBILITY STUDIES. | 2025-07-09 | 4,990,831.71 | obligated | Link |
| DoD | CONTRACTOR PROVIDED SPACE CRAFT AND GROUND TECHNICAL SPECIFICATION SHEET DELIVERY ORDER AS PART OF THE REQUIREMENT SPECIFIED IN SECTION M OF THE IDIQ | 2025-06-11 | 5,000 | obligated | Link |
| NASA | FCS-P3-CR. IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY. | 2025-06-05 | 3,249,267 | obligated | Link |
| Space Force | Lockheed Martin: CORE OPERATIONS AND SUSTAINMENT PROVIDES INTEGRATED SYSTEMS ENGINEERING SUSTAINMENT SUPPORT FOR PROTECTED EXTREMELY HIGH FREQUENCY SATELLITE COMMUNICATIONS SATELLITES, MILSTAR BLOCK… | 2025-01-01 | 343,272,850.75 | — | — |
| NASA | NASA GSFC GEOSTATIONARY EXTENDED OBSERVATIONS (GEOXO) LIGHTNING MAPPER (LMX) INSTRUMENT IMPLEMENTATION. THE LMX INSTRUMENT IS A SINGLE SPECTRAL CHANNEL INSTRUMENT USED TO MEASURE THE LOCATION AND INT… | 2024-10-10 | 74,000,000 | obligated | Link |
| NASA | Lockheed Martin: TECHNOLOGY MATURATION FOR ASTROPHYSICS SPACE TELESCOPES (TECHMAST) | 2024-09-20 | 4,759,423.96 | — | — |
| NASA | CONTRACTOR TO PROVIDE RAPID STUDIES FOR THE MARS SAMPLE RETURN (MSR) PROGRAM. | 2024-07-16 | 1,429,983 | obligated | Link |
| NASA | DESIGN BUILD AND DELIVER 3 GEOXO SPACECRAFT | 2024-07-01 | 438,374,601 | obligated | Link |
| DoD | MOBILE USER OBJECTIVE SYSTEM SERVICE LIFE EXTENSION PHASE 1 | 2024-02-02 | 92,236,513 | obligated | Link |
| NASA | PWIII - IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY. | 2023-09-15 | 2,671,620 | obligated | Link |
| NASA | FFT - IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY. | 2023-09-14 | 3,871,841.50 | obligated | Link |
| DoD | SPUD PARCS DEWR | 2023-08-15 | 6,915,511 | obligated | Link |
| NASA | MOONBEAM STEP 1 INCLUDING SPACECRAFT, SYSTEM INTEGRATION AND TEST, MISSION OPERATIONS, AND MISSION OPERATION CONTROL CENTER. | 2023-02-13 | 240,868 | obligated | Link |
| NASA | OML-S - IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY. | 2022-11-29 | 3,997,571 | obligated | Link |
| NASA | RESEARCH AND DEVELOPMENT - "FCS-S DEMO" PLEASE CONTACT CONTRACTING OFFICER FOR MORE INFORMATION | 2022-09-08 | 4,999,604 | obligated | Link |
| Space Force | Lockheed Martin: GLOBAL POSITIONING SYSTEM IIR/IIR-M,III,IIIF ON ORBIT SUPPORT TASK ORDER | 2022-07-01 | 146,002,698.26 | — | — |
| Space Force | Lockheed Martin: SPACE BASED INFRARED SYSTEMS CONTRACTOR LOGISTICS SUPPORT. PRODUCT SUPPORT INTEGRATION, CONTRACT EVOLUTION | 2021-07-02 | 1,488,705,765 | — | — |
| Space Force | Lockheed Martin: COMBINED ORBITAL OPERATIONS, LOGISTICS, AND RESILIENCY CORE SUSTAINMENT. | 2021-06-01 | 656,212,168.80 | — | — |
| Space Force | Lockheed Martin: SPACE TRANSPORT LAYER TRANCHE 0 (QTY 10 SPACE VEHICLES) | 2020-08-31 | 210,178,271.44 | — | — |
| NASA | Lockheed Martin: THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND BRIDGE PHASE B OPTION REQUIREMENTS OF NASA'S CO… | 2020-05-29 | 38,328,508 | — | — |
| Space Force | Lockheed Martin: NEXT GENERATION OVERHEAD PERSISTENT INFRARED GEOSYNCHRONOUS EARTH ORBIT SPACE VEHICLE 1-3 PHASE 1 | 2018-08-14 | 7,476,775,910.20 | — | — |
| NASA | Lockheed Martin: THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITE… | 2017-06-14 | 352,834,981.32 | — | — |
| NASA | Lockheed Martin: IGF::OT::IGF NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, T… | 2015-09-23 | 48,581,123.84 | — | — |
| Space Force | Lockheed Martin — IGF::CT::IGF SPACE FENCE PROGRAM FINAL ENGINEERING AND MANUFACTURING DEVELOPMENT; PRODUCTION AND DEPLOYMENT | 2014-06-02 | 1,039,565,269.97 | — | — |
| NASA | Lockheed Martin — PERFORMS NON-PERSONAL TECHNICAL AND MANAGMENT SERVICES IN SUPPORT OF TEST OPERATIONS, CORE OPERATIONS, AND MAINTENANCE ACTIVITIES AT JOHN C. STENNIS SPACE CENTER, MS. | 2011-04-01 | 133,402,387.94 | — | — |
| NASA | Lockheed Martin: INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS… | 2009-10-01 | 194,065,277.27 | — | — |
| NASA | Lockheed Martin: RISK REDUCTION AND PHASE B EFFORT IN SUPPORT OF THE MARS ATMOSPHERIC AND VOLATILE EVOLUATION (MAVEN) PROJECT. THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE MAV… | 2009-04-02 | 299,854,344 | — | — |
| NASA | Lockheed Martin: THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOE… | 2008-12-04 | 2,032,829,134.57 | — | — |
| NASA | Lockheed Martin: TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MA… | 2007-12-13 | 486,590,471 | — | — |