| DoD | SATCOM SPACE VEHICLE | 2026-05-14 | 102,000,000 | obligated | Link |
| NASA | HABITABLE WORLDS OBSERVATORY SYSTEM TECHNOLOGY DEMONSTRATIONS AND MISSION ARCHITECTURE STUDIES | 2026-05-11 | 11,376,989 | obligated | Link |
| DoD | CONCEPT DEVELOPMENT MINIMUM GUARANTEE | 2026-04-29 | 100,000 | obligated | Link |
| NASA | TEST ARTICLE II. IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY. | 2025-08-08 | 874,834 | obligated | Link |
| DoD | DESIGN, DEVELOP, TEST, AND PRODUCE GLOBAL VARIANTS OF THE PROTECTED TACTICAL SATELLITE COMMUNICATION SPACE VEHICLES, ASSOCIATED GROUND SYSTEMS AND ANCHOR STATIONS | 2025-07-28 | 7,500,000 | obligated | Link |
| NASA | V'GER - IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY. | 2025-04-24 | 189,808 | obligated | Link |
| NASA | ADVANCED X-RAY IMAGING SATELLITE (AXIS) PHASE A | 2025-02-04 | 745,840 | obligated | Link |
| Space Force | Northrop Grumman: DEEP SPACE ADVANCED RADAR CAPABILITY SITE 2 PRODUCTION | 2025-02-03 | 191,473,846.05 | — | — |
| NASA | EP STUDY. IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY. | 2024-12-17 | 694,720 | obligated | Link |
| NASA | HELIOSWARM PROGRAM SUPPORT | 2024-09-24 | 90,130,768.05 | obligated | Link |
| NASA | STABLE: SYSTEMS TECHNOLOGIES FOR ARCHITECTURE BASELINE | 2024-09-12 | 3,502,252 | obligated | Link |
| NASA | STRATOSPHERE TROPOSPHERE RESPONSE USING INFRARED VERTICALLY-RESOLVED LIGHT EXPLORER (STRIVE) SPACECRAFT AND MISSION OPS PHASE A | 2024-08-21 | 3,993,999 | obligated | Link |
| NASA | TEST ARTICLE - IF MORE INFORMATION IS NEEDED, PLEASE CONTACT THE CO DIRECTLY. | 2024-08-06 | 33,554,544 | obligated | Link |
| NASA | CONTRACTOR TO PROVIDE RAPID STUDIES FOR THE MARS SAMPLE RETURN (MSR) PROGRAM. | 2024-07-15 | 983,684 | obligated | Link |
| NASA | ATMOSPHERE OBSERVING SYSTEM INCLINED PROPULSIVE EVOLVED EXPENDABLE LAUNCH VEHICLE SECONDARY PAYLOAD ADAPTER SPACECRAFT ACCOMMODATION STUDY DELIVERY ORDERS | 2023-09-15 | 825,000 | obligated | Link |
| NASA | THE PURPOSE OF THIS CONTRACT IS A PHASE A DEFINITION STUDY FOR THE SOUNDER FOR MICROWAVE-BASED APPLICATIONS INSTRUMENTS, THE NEXT GENERATION LOW-EARTH ORBIT MICROWAVE SOUNDERS. | 2023-09-06 | 4,995,327 | obligated | Link |
| DoD | NG QUINT STUDY | 2023-07-13 | 50,000 | obligated | Link |
| NASA | ATMOSPHERE OBSERVING SYSTEM INCLINED SPACECRAFT ACCOMMODATION STUDY | 2023-06-09 | 1,175,000 | obligated | Link |
| Space Force | Northrop Grumman: DEFENSE EXPERIMENTATION USING COMMERCIAL SPACE INTERNET CALL 003 MULTI-BAND, MULTI-ORBIT SATELLITE COMMUNICATIONS EXPERIMENTS | 2023-06-02 | 180,286,321 | — | — |
| DoD | EWS | 2023-05-24 | 51,421,509 | obligated | Link |
| NASA | ATMOSPHERE OBSERVING SYSTEM - POLAR (AOS-P) SPACECRAFT ACCOMMODATION STUDY | 2023-05-05 | 1,800,000 | obligated | Link |
| NASA | LANDSAT NEXT (LNEXT) SPACECRAFT STUDY | 2023-04-03 | 1,450,000 | obligated | Link |
| NASA | Northrop Grumman: THE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT. | 2022-12-25 | 27,100,599 | — | — |
| Space Force | Northrop Grumman: RAPID ON-ORBIT SPACE TECHNOLOGY EVALUATION RING | 2022-07-06 | 78,770,594.22 | — | — |
| NASA | Northrop Grumman: THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE NASA WITH BLOCK 20 GLOBAL HAWK AIRCRAFT SUPPORT AND ADDITIONAL TECHNICAL SUPPORT FOR GROUND/FLIGHT/GCS DATA/SATCOMM SYSTEMS OPERATIONS. | 2021-09-02 | 7,203,938.46 | — | — |
| NASA | Northrop Grumman: SPACECRAFT SUSTAINING ENGINEERING SUPPORT SERVICES FOR THE EARTH OBSERVING SYSTEM (EOS) AQUA AND AURA SPACECRAFT. THE PRINCIPAL PURPOSE OF THE REQUIREMENT IS FOR THE GOVERNMENT TO O… | 2021-04-01 | 2,916,904 | — | — |
| Space Force | Northrop Grumman: EVOLVED STRATEGIC SATCOM SATELLITE PAYLOAD DEVELOPING HARDWARE AND SOFTWARE | 2020-09-16 | 425,294,427.82 | — | — |
| Space Force | Northrop Grumman: NEXT GENERATION OVERHEAD PERSISTENT INFRARED POLAR SPACE VEHICLES 1 AND 2 STUDY. | 2018-06-25 | 3,485,513,539.13 | — | — |
| Space Force | Northrop Grumman: IGF::CT::IGF L174 LAUNCH SERVICE AND MISSION ASSURANCE SPT | 2018-05-31 | 58,505,538 | — | — |
| NASA | Northrop Grumman: SWIRP COMPACT SUBMM-WAVE AND LWIR POLARIMETERS FOR CIRRUS ICE PROPERTIES. THIS EFFORT COVERS THE NORTHROP GRUMMAN AEROSPACE SYSTEMS (NGAS) PORTION OF THE WORK BEING PERFORMED IN SUP… | 2017-10-01 | 1,667,050.26 | — | — |
| NASA | Northrop Grumman: IGF::OT::IGF MODULAR SPACE VEHICLE AUXILIARY PAYLOAD SYSTEM (APS) MODULAR SPACE VEHICLE (MSV) TASK ORDER THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPPLIES, MATERIALS, TRAVEL, OTHER D… | 2016-09-14 | 77,303,408.65 | — | — |
| NASA | Northrop Grumman — IGF::OT::IGF EOS AQUA AND AURA SPACECRAFT SUSTAINING ENGINEERING SUPPORT SERVICES | 2016-04-01 | 2,874,913 | — | — |
| NASA | Northrop Grumman: IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTIN… | 2015-09-03 | 1,780,030,031.31 | — | — |
| NASA | Northrop Grumman: JOINT POLAR SATELLITE SYSTEM-2 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2 SP… | 2015-03-30 | 575,251,038.25 | — | — |
| NASA | Northrop Grumman: THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESEN… | 2014-03-24 | 103,107,122 | — | — |