Orbital Data Center Programs
Last checked 47 minutes ago.
Showing 1–20 of 59 records
About this dataset
Records published59
Record types1
Dated records58 (98%)
Date range1 Jan 2022 – 1 Oct 2026
Last checked47 minutes ago
Figures computed 46 minutes ago, when the dataset last changed.
- Values
- 8
- Median
- USD 8.2 million
- Smallest
- USD 5 million
- Largest
- USD 433.4 million
- Total
- USD 803.3 million
More statistics
Show table
| Month | Records |
|---|---|
| 2022-01 | 1 |
| 2022-02 | 0 |
| 2022-03 | 0 |
| 2022-04 | 0 |
| 2022-05 | 0 |
| 2022-06 | 0 |
| 2022-07 | 0 |
| 2022-08 | 0 |
| 2022-09 | 0 |
| 2022-10 | 0 |
| 2022-11 | 0 |
| 2022-12 | 0 |
| 2023-01 | 0 |
| 2023-02 | 0 |
| 2023-03 | 0 |
| 2023-04 | 0 |
| 2023-05 | 0 |
| 2023-06 | 0 |
| 2023-07 | 0 |
| 2023-08 | 0 |
| 2023-09 | 0 |
| 2023-10 | 0 |
| 2023-11 | 0 |
| 2023-12 | 0 |
| 2024-01 | 2 |
| 2024-02 | 0 |
| 2024-03 | 0 |
| 2024-04 | 0 |
| 2024-05 | 0 |
| 2024-06 | 1 |
| 2024-07 | 0 |
| 2024-08 | 0 |
| 2024-09 | 0 |
| 2024-10 | 0 |
| 2024-11 | 0 |
| 2024-12 | 0 |
| 2025-01 | 0 |
| 2025-02 | 0 |
| 2025-03 | 0 |
| 2025-04 | 2 |
| 2025-05 | 1 |
| 2025-06 | 1 |
| 2025-07 | 0 |
| 2025-08 | 0 |
| 2025-09 | 1 |
| 2025-10 | 0 |
| 2025-11 | 1 |
| 2025-12 | 1 |
| 2026-01 | 2 |
| 2026-02 | 2 |
| 2026-03 | 2 |
| 2026-04 | 5 |
| 2026-05 | 6 |
| 2026-06 | 4 |
| 2026-07 | 4 |
| 2026-08 | 4 |
| 2026-09 | 12 |
| 2026-10 | 6 |
Show table
| By category | Records | Share |
|---|---|---|
| Concept | 24 | 41% |
| Payload demo flown | 17 | 29% |
| Own satellite flown | 10 | 17% |
| Pathfinder constellation | 3 | 5% |
| Funded study | 2 | 3% |
| Ground prototype | 2 | 3% |
| Operational service | 1 | 2% |
Show table
| By country | Records | Share |
|---|---|---|
| US | 31 | 53% |
| CN | 9 | 15% |
| IN | 4 | 7% |
| AE | 2 | 3% |
| CA | 2 | 3% |
| JP | 2 | 3% |
| DE | 1 | 2% |
| FR | 1 | 2% |
| IL | 1 | 2% |
| IT | 1 | 2% |
| KE | 1 | 2% |
| KR | 1 | 2% |
| LU | 1 | 2% |
| PL | 1 | 2% |
| SE | 1 | 2% |
- Values
- 8
- Smallest
- USD 5 million
- Median
- USD 8.2 million
- Mean
- USD 100.41 million
- Largest
- USD 433.4 million
- Middle half
- USD 5 million – USD 91.38 million
- Total
- USD 803.3 million
Show table
| Range | Records |
|---|---|
| USD 5 million – USD 90.68 million | 6 |
| USD 90.68 million – USD 176.36 million | 0 |
| USD 176.36 million – USD 262.04 million | 0 |
| USD 262.04 million – USD 347.72 million | 1 |
| USD 347.72 million – USD 433.4 million | 1 |
- Day 86% 50
- Month 12% 7
- Year 2% 1
Show table
| Date precision | Records | Share |
|---|---|---|
| Day | 50 | 86% |
| Month | 7 | 12% |
| Year | 1 | 2% |
| Name↕, sortable; sort Name, A to Z | Country↕, sortable; sort Country, A to Z | Type↕, sortable; sort Type, A to Z | Stage↕, sortable; sort Stage, A to Z | Stage (1–7)↕, sortable; sort Stage (1–7), lowest first | Latest milestone▲, sorted ascending; sort Latest milestone, Z to A | Date↕, sortable; sort Date, earliest first | Next step↕, sortable; sort Next step, A to Z | Verified funding (USD)↕, sortable; sort Verified funding (USD), lowest first |
|---|---|---|---|---|---|---|---|---|
| Satlyt | KE | Startup | Payload demo flown | 4 | $8M seed | — | USD 8 million | |
| Space String (Space.IDC Computing Constellation) | CN | Startup | Own satellite flown | 5 | Agricultural Bank of China and ICBC sign RMB 5B credit lines each | G1 verification satellite (11.5 kW compute payload) | Not disclosed | |
| Altair constellation (Loft Orbital, Marlan Space, Orbitworks) | AE | Consortium | Own satellite flown | 5 | Altair-1 launched on Transporter-18; signal acquired, commissioning | The other nine satellites of the first ten | Not disclosed | |
| OpenAI (skeptic) | US | Big tech | Concept | 1 | Altman: focused on building on Earth for now | — | Not disclosed | |
| D-Orbit ION in-orbit computing | IT | Supplier | Payload demo flown | 4 | AWS and Unibap edge computing run on an ION carrier | Approximate | — | Not disclosed |
| CASC and CAST space computing plan | CN | Prime contractor | Concept | 1 | CASC plan via CCTV: gigawatt-class space digital-intelligence infrastructure | Experimental 10 kW-class computing satellite (about 1,000 kg) | Not disclosed | |
| KP Labs (Leopard DPU) | PL | Supplier | Own satellite flown | 5 | Collaboration with Parsimoni (Leopard plus SpaceOS) | Leopard DPU on ESA OPS-SAT VOLT | Not disclosed | |
| Kepler Communications (Kepler Compute) | CA | Startup | Operational service | 7 | Compute opened to commercial customers | Next tranche across multiple launches, including a dedicated Rocket Lab launch, with up to 100 Gbps links | Not disclosed | |
| Muon Space (Condor-Ultra bus) | US | Supplier | Concept | 1 | Condor-Ultra platform unveiled | Condor-Ultra pathfinder delivery | Not disclosed | |
| ADA Space Star Compute | CN | Startup | Pathfinder constellation | 6 | Departure ceremony for the first 8 Group 02 satellites | Deploy Group 02 and Group 03 computing satellites | Not disclosed | |
| Reflex Aerospace (Orbital-1 platform) | DE | Supplier | Concept | 1 | Exclusive design-and-development agreement with Orbital | Launch Orbital-1 | Not disclosed | |
| Ramon.Space | IL | Supplier | Ground prototype | 3 | Expanded Ingrasys partnership for orbital data center infrastructure | Fly early samples | Not disclosed | |
| Anthropic (prospective customer) | US | Big tech | Concept | 1 | Expresses interest in multi-gigawatt orbital compute with SpaceX | — | Not disclosed | |
| Starcloud | US | Startup | Own satellite flown | 5 | Firefly signs Starcloud SC-1L lunar-orbit compute payload | Two Starcloud-2 satellites (8 kW each) on rideshare | USD 433.4 million | |
| Google Project Suncatcher | US | Big tech | Own satellite flown | 5 | First Suncatcher prototype launched on Transporter-18; contact confirmed | Two-satellite mission testing inter-satellite laser links | Not disclosed | |
| Shanghai Xingshu Tiansuan constellation | CN | Startup | Concept | 1 | First-constellation design unveiled at WAIC | First satellite, Fuxi-1 | Not disclosed | |
| PowerBank and Smartlink AI (Orbit AI) | CA | Startup | Concept | 1 | Genesis-1 launch claimed (company release; unverified) | 5 to 8 more satellites | Not disclosed | |
| K2 Space | US | Supplier | Concept | 1 | Gravitas (first Mega class, 20 kW) launched and operating | Operational commercial and national security constellations begin deployment | Not disclosed | |
| Hanwha Systems space AI data center plan | KR | Prime contractor | Concept | 1 | Group plan announced: KRW 55T by 2040, about KRW 20T to Hanwha Systems | 64 SAR satellites operational (data source for the orbital data center) | Not disclosed | |
| Unibap SpaceCloud | SE | Supplier | Payload demo flown | 4 | iX20 space computer introduced | — | Not disclosed |
About this data
Shows the provider’s latest snapshot.
Coverage of this source
- SpaceNexus — Orbital data center programs (CSV): SpaceNexus compilation of orbital data center programs from public sources (CC BY 4.0); every fact cites its source.
